TIME-LAPSE VIDEOS
Use the back arrow to return to the previous page.
- June 14th, Cutting down tree that overhung the house - 50 sec.
- July 26th, Excavating and compacting the basement floor - 1 min., 22 sec.
- July 27th, Completing Frost Wall Excavating - 1 min., 45 sec.
- August 2nd, Pouring footings on Day 6 - 58 sec.
- August 9th, Started laying ICF's - 58 sec.
- August 13th, Pouring 7 yards of concrete into ICF Frost Foundation Wall - 1 min., 12 sec.
- August 25th, Adding frame for door in ICF wall - 1 min., 35 sec.
- August 28th, Pouring 60 yards of concrete into Insulated Concrete Forms - 2 min., 52 sec.
- September 14th, Poured 20 yards of concrete for basement floor - 2 min., 4 sec.
- September 25th, Building front wood wall in basement foundation - 1 min., 36 sec.
- September 26th, Installing the 16" Open Joist Floor Trusses - 1 min., 52 sec.
- September 26th, Installing the 3/4" AdvanTech tongue and groove subfloor - 1 min., 39 sec.
- September 27th, Starting the exterior walls on the East side of the house - 1 min., 29 sec.
- October 1st, Building the exterior wall on the front of the house - 1 min., 13 sec.
- More videos will be coming soon, they take a lot of time.